Wednesday, March 2, 2016

PT Krakatau Posco Energy
PT Krakatau Posco Energy / krakatauposcoenergy.com
PT Krakatau Posco Energy - KPE or referred to as "Krakatau Posco Energy" is a rapid growing electricity power plant company in Indonesia which is already established since 2011. Krakatau Posco Energy is an international joint venture company between South Korea's Posco Energy (POSCO Group) and Indonesia's PT Krakatau Daya Listrik (KDL), respectively with share ownership of 90% and 10%. PT Krakatau Daya Listrik is a directly-owned subsidiary company of state-owned steel producers PT Krakatau Steel (Persero) Tbk (Krakatau Group). Krakatau Posco Energy is based in Krakatau Industrial Estate Cilegon Banten and now  has gas waste electricity power plant with total installed power capacity of 2 x 100 megawatt. The Construction stage of its power plants started in September 2011 with total investment of USD 250 million. Its power plants officially inaugurated in January 2014.

To support its progressive growth and build the organizational capability, PT Krakatau Posco Energy invites potential candidates who meet the following requirements to fill the positions of

Supervisor of Maintenance and Operation of Power Plant

Requirements
  • Male, age of candidate under 27 years old.
  • Background in Bachelor Degree (S1), majoring in the following disciplineMechanical Engineering
    • Electrical Engineering
    • Physics Engineering
    • Instrumentation Engineering
  • Have a GPA score min 2.85 (scale 4.0)
  • Have a  TOEFL score min 485.
  • Good personality, high integrity, and discipline.
  • Hard working, diligent.
  • Creative, initiative.
  • Able to interact with other teams effectivelly
  • Willing to be stationed at Kawasan Industri Krakatau, Cilegon, Banten.
For further information, please refer official source from CDC UI on following link below. If you feel that you can meet the qualification and up to the challenge, please fill out CV application form (download here) based on true written evidence (file name: OPR_GPA_University) and then send CV application form along with your diploma, transcript, and TOEFL certificate to recruitment@krakatauposcoenergy.com with subject : OPR_Name_GPA_Major_University. All applications are appreciated and will be treated confidentially. Only candidates that meet the above qualification will be shortlisted. (JobsCDC.com/Source)


EmoticonEmoticon